3rd Army Headquarters Building

,

Griffith Engineering, Inc. designed a new chilled water system for this facility that was integrated without a shutdown of building chilled water service.

Peninsula Regional Medical Center – Energy Audit

In 2011, Griffith Engineering performed an energy audit and analysis on the Peninsula Regional Medical Center (PRMC).