Project Description

Florida A&M University
Tallahassee, FL

Design and construction documents for the decentralization of the school’s steam system. The project included:

▪ Removal of 11 buildings from the central steam system.

▪ 8 new outdoor boilers and 3 indoor units in new boiler buildings.

▪ A dedicated outside air unit at Colman Library.

▪ Architectural screen design for outdoor boilers.

▪ $6.6 million project.

GEI provided mechanical, electrical, and plumbing engineering services, as well as architectural design services, to a design/build contractor on this project.